학술발표회 논문집
Year | Div | Date/Time | ROOM | Title | Author | Abstract File | Presentation File |
---|---|---|---|---|---|---|---|
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Effects of Variability of Seismic Fragility Analysis Variables on Seismic Capacity of Structure | Kang-Ryong Choi (KINS), Yong Il Lee and Sung Gook Cho (JACE KOREA) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Output-Only Modal Identification of a Containment Building from Ambient Vibration Measurements | Sooyong Park, Yung-Moo Shin, and Ha-Yeon Kim (HHU), Sanghyun Choi and Dae-Hyuk Kim (KRC), Chang-Hun | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Development of a Seismic Risk Assessment Program | In-Kil Choi and Jin-Hee Park (KAERI), Do-Yeon Kim (KICM) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Seismic Base Isolation Analysis for PASCAR Liquid Metal Reactor | Kuk-Hee Lee, Bong Yoo, and Yun-Jae Kim (KU) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Incoherent SSI Analysis of Reactor Building Using 2007 Hard-Rock Coherency Model | Joo-Hyung Kang and Sang-Hoon (KOPEC) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Application of a Long Term Asset Management Strategy for HP Feedwater Heaters | Se Youl Won, Eun Sub Yun, and Young Sheop Park (KHNP) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Development of Weld Overlay System for Dissimilar Metal Alloy 82/182 Butt Welds | K. S. Park, J. G. Byeon, and Y. J. Kim (Doosan Heavy Co., Ltd) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Benefit-Cost Assessment for Long Term Asset Management Strategy in Nuclear Power Plants | Kyung-Hwan Na, Hansang Kim, and Eunsub Yun (KHNP) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Economic Evaluation of Safety-Related SSC’s Improvement | Eunsub Yun, Hansang Kim, and Young-Sheop Park (KHNP) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | A Correlation Between the Core Thermal Power Distribution and Hot Leg RTD Temperature | H. C. Jang, B. J. Lee, S. H. Kim, J. S. Cheong, and S. J. Baik (KOPEC), C. J. Lim (KNF) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Performance Assessment of Wolsung Unit 2 Safety Grade Pumps Using In-Service Test | Chang Ho Lee (KHNP), Young Wook Chung and Byung Chul Lee (FNC) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | A Study on Replacement of HEPA Filter In-place Leak Test Challenge Agent from DOP to PAO in NPP | S. K. Lee, K. Kim, and S. H. Shon (KEPRI), J. C. Bae, J.S.Park, and B.H. Cho (KHNP), B. J. Yu (KPS), | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Reassessment of ESF Atmosphere Cleanup System’s Moisture Control with 10-hour Operability Test | S. K. Lee, K. Kim, and S. H. Sohn (KEPRI), J. C. Bae, J. S. Park, J. G. Lim, and B. H. Cho (KHNP), S | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | Development of Automated UT Scanner for NPP Dissimilar Metal | Lee Dong Min, Cho Hong Seok, Lee Jang Uk, and Choi Sang Hun (KPS) | PDF보기 | - | ||
2008-Autumn | 제 8 분과 : 원자력발전소 건설 및 운영(Construction and Operation of NPP) | An Implementation of Main Steam Flow-Based Calorimetric Power Measurement for Yonggwang Nuclear Power Plant Unit 4 | Byung Ryul Jung, Jeong Hoon Kim, In Ho Song, Byung Jin Lee, and Se Jin Baik (KOPEC), Jong Sun Lee a | PDF보기 | - |
Last Modified : 1998-Autumn