학술발표회 논문집
Year | Div | Date/Time | ROOM | Title | Author | Abstract File | Presentation File |
---|---|---|---|---|---|---|---|
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 13:30 | 202 (2F) | Optimization of Maintenance for the Turbine Lube Oil System in NPP | Emmanuel Efenji(KINGS), Hoon Lee(KINGS), Hassan Mostafa(KINGS), Anh Le (KINGS), Jun Choi(KINGS), and Yong-kwan Lee(KINGS) | PDF보기 | PPT보기 |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 13:50 | 202 (2F) | Improving the Reliability of LDP through the Divergence of Power Supply for LDP | Bang Sil Lee(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 14:10 | 202 (2F) | A Study on Degree of Conservatism of PZR Inventory during Event Analysis | Sang Seob Lee(KEPCO E&C), Min Soo Park(KEPCO E&C), Jae Yong Huh(KEPCO E&C), and Gyu Cheon Lee(KEPCO E&C) | PDF보기 | - |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 14:30 | 202 (2F) | Application of Reliability Centered Maintenance (RCM) for CVCS- Charging System | Mohamed Faragalla(KINGS), Osama Rezk(KINGS), VIctor Ouma(KINGS), Hilda Mpakany(KINGS), Jun-ki Baik(KINGS), Mohammad Gomaa(KINGS), Vaysidin Saidov(KINGS), and Yong-Kwan Lee(KINGS) | PDF보기 | PPT보기 |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 14:50 | 202 (2F) | The Safety Analysis to Increase for the Water Temperature of the HPECC in WSNPP-1 | Sungmin Kim(KHNP CRI), Euiseung Ryu(KHNP CRI), Sungchang You(KHNP CRI), and Dongsik Jin(ACT Co., Ltd.) | PDF보기 | - |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 15:30 | 202 (2F) | A Study on the Flow Characterization in the Reactor Cavity | Ho Jung Lee(KEPCO E&C), Kwang Jeok Ko(KEPCO E&C), Sung Hwan Kim(KEPCO E&C), Min Gyu Kim(KEPCO E&C), Yeon Ho Cho(KEPCO E&C), and Hyun Min Kim(KEPCO E&C) | PDF보기 | - |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 15:50 | 202 (2F) | Evaluation of the Planned Outage Durations in EU-APR | Byung Joon Jung(KHNP CRI) and Keun Sung Lee(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8C : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.28(Fri) 16:10 | 202 (2F) | Improvement of Engineering Work Efficiency through System Integration | Sangdae LEE(KHNP CRI), Sunghan JO(KHNP CRI), and Jinwoo HYUN(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | Characteristic Assessments of the Phased Array UT System Developed by KHNP | Chan-Hee Cho(KHNP CRI), Dong-Hyun Jee(KHNP CRI), Tae-Hun Lee(KHNP CRI), and Hyun-Ju Yoo(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | Evaluation of Effective Diaphragm Area for Pneumatic Actuator | Hogeun Ryu(SSI), Bongsub Han(SSI), and Juhyoung Seon(SSI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | Control Performance Enhancements of Control Valves? In Nuclear Power Plants | Hogeun Ryu(SSI), Bongsub Han(SSI), and Juhyoung Seon(SSI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | APR1400 Electrical Power System Conformance to SECY-91-078 | Che-wung Ha(KHNP CRI) and Yun-ho Kim(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | Search and Retrieval of Foreign Objects for the Steam Generator of Wolsung NPP Unit 1 | Woo-tae Jeong(KHNP CRI) and Kyung-ho Lee(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | Evaluation of the Use of Ultra Low Sulfur Diesel Oil for an Emergency Diesel Generator | Youngchul Yun(KHNP CRI) and Woogeun Chung(KHNP CRI) | PDF보기 | - |
2016-Autumn | 8D : 원전건설 및 운영기술 (Nuclear Power Plant Construction and Operation Technology) | 10.27(Thu) 13:00 ~ 15:00 | 로비 (3F) | A Study on the?Configuration of the?Electric Power System in the Defueled Condition | Hee Taek Lim(KHNP CRI) and Eui Jong Lee(KHNP CRI) | PDF보기 | - |
Last Modified : 1998-Autumn